Tuesday, May 17, 2011

The Fitout is Underway

Security including video surveillance and security system is all in place and in operation. Jet Electrical has completed the board.
The internal fitout has commenced. Zol and the guys from Cutting Edge have installed the kitchen cupboards, pantry, WIR and WIL, the laundry cupboards and the office area. They have done a fantastic job. We are so happy with the kitchen and looking forward to the bench tops going on. It all looks amazing.
 












  
Chris finished the wooden floors and is now working on the bannister for the stairs and the back deck. His workmanship is amazing. He is so particular about the measurement to ensure all the woods fits in properly. He even framed up the area where the hearth tiles will go so that the wood would be even in the area.




Dave is continuing with the tiles. The floors in most of the areas are tiled and grouted. It is such a neat job especially where he has had to make cuts to get the fall right for drainage.


The tradesman and the apprentice are still working each weekend with the focus now on installing the lights, switches and power points. We are getting very excited at the prospect of moving in very soon.










And today Brent turns 50. Happy Birthday Brent despite the impact of a cold!!
 

No comments:

Post a Comment